{"id":5704,"date":"2018-05-16T15:21:40","date_gmt":"2018-05-16T06:21:40","guid":{"rendered":"https:\/\/www.toyo-const.co.jp\/en\/?page_id=5704"},"modified":"2018-05-16T17:39:31","modified_gmt":"2018-05-16T08:39:31","slug":"construction","status":"publish","type":"page","link":"https:\/\/www.toyo-const.co.jp\/en\/technology\/construction","title":{"rendered":"Architectural Technologies"},"content":{"rendered":"<div class=\"content\">\n<div class=\"content-column-l\">\n<ul class=\"technologies\">\n<li>\n<section class=\"toggle-box\">\n<header>\n          <label class=\"technology-box toggle-button-label\"><\/p>\n<header>\n<div class=\"technology-name-box\">\n<div class=\"technology-name\">\n<div class=\"category-item-name\">Architectural Technologies<\/div>\n<h2>Logistics Facilities<\/h2>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"technology-image\">\n                <img decoding=\"async\" src=\"\/wp\/wp-content\/uploads\/2018\/03\/butsuryu.jpg\" \/>\n              <\/div>\n<\/header>\n<p>            <input class=\"toggle-button\" type=\"checkbox\" \/><\/p>\n<div class=\"toggle-icon\">Proposed Technologies<\/div>\n<p>          <\/label><\/p>\n<div class=\"techonology-details toggle-content\">\n<ul>\n<li><a href=\"\/en\/technology\/construction\/facility1\/\">Proposed Technologies for Logistics Facilities<\/a><\/li>\n<\/ul>\n<section class=\"toggle-box\">\n<header>\n<h5>Planning and Proposals<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/plan1\/\">BIM<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan2\/\">CG<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan3\/\">CFD\/simulation<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan4\/\">VR<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan5\/\">LC Support System<\/a><\/li>\n<\/ul>\n<\/section>\n<section>\n<header>\n<h5>Structural Technologies<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/struct1\/\">RCS Joint Construction Method<\/a><\/li>\n<\/ul>\n<\/section>\n<section>\n<header>\n<h5>Construction Technologies<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/build1\/\">Concrete Fill Compaction Detection System<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/build2\/\">Broad-range Monitoring System of Construction Noise<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/build3\/\">Cast-in-place Stainless Steel Floor Construction Method<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan1\/\">BIM<\/a><\/li>\n<\/ul>\n<\/section>\n<\/div>\n<\/section>\n<\/li>\n<li>\n<section class=\"toggle-box\">\n<header>\n            <label class=\"technology-box toggle-button-label\"><\/p>\n<header>\n<div class=\"technology-name-box\">\n<div class=\"technology-name\">\n<div class=\"category-item-name\">Architectural Technologies<\/div>\n<h2>Houses<\/h2>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"technology-image\"><img decoding=\"async\" src=\"\/wp\/wp-content\/uploads\/2018\/03\/juutaku.jpg\" \/><\/div>\n<\/header>\n<p>            <input class=\"toggle-button\" type=\"checkbox\" \/><\/p>\n<div class=\"toggle-icon\">Proposed Technologies<\/div>\n<p>           <\/lavel><\/p>\n<div class=\"techonology-details toggle-content\">\n<ul>\n<li><a href=\"\/en\/technology\/construction\/facility3\/\">Proposed Technologies for Houses<\/a><\/li>\n<\/ul>\n<section>\n<header>\n<h5>Planning and Proposals<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/plan1\/\">BIM<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan2\/\">CG<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan3\/\">CFD\/simulation<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan4\/\">VR<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan5\/\">LC Support System<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan6\/\">Architectural Acoustics Design<\/a><\/li>\n<\/ul>\n<\/section>\n<section>\n<header>\n<h5>Structural Technologies<\/h5>\n<\/header>\n<ul>\n<li style=\"list-style-type: none;\">\n<!--\n \t\n\n<li><a href=\"\/en\/technology\/construction\/struct3\/\">ATOMiK\u5408\u6210\u5730\u4e0b\u5916\u58c1\u69cb\u6cd5<\/a><\/li>\n\n\n--><\/p>\n<li><a href=\"\/en\/technology\/construction\/struct5\/\">SHS Permanent Ground Anchor Construction Method <\/a><\/li>\n<p><!--\n \t\n\n<li><a href=\"\/en\/technology\/construction\/struct6\/\">SRC-LAPhoop\u5de5\u6cd5<\/a><\/li>\n\n\n--><\/p>\n<li><a href=\"\/en\/technology\/construction\/struct7\/\">Base Isolation Construction Method<\/a><\/li>\n<\/ul>\n<\/section>\n<section>\n<header>\n<h5>Construction Technologies<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/build1\/\">Concrete Fill Compaction Detection System<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/build2\/\">Broad-range Monitoring System of Construction Noise<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan1\/\">BIM<\/a><\/li>\n<\/ul>\n<\/section>\n<\/div>\n<\/section>\n<\/li>\n<li>\n<section class=\"toggle-box\">\n<header>\n<p>            <label class=\"technology-box toggle-button-label\"><\/p>\n<header>\n<div class=\"technology-name-box\">\n<div class=\"technology-name\">\n<div class=\"category-item-name\">Architectural Technologies<\/div>\n<h2>Offices and Government Buildings<\/h2>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"technology-image\"><img decoding=\"async\" src=\"\/wp\/wp-content\/uploads\/2018\/03\/jimusyo.jpg\" \/><\/div>\n<\/header>\n<p>            <input class=\"toggle-button\" type=\"checkbox\" \/><\/p>\n<div class=\"toggle-icon\">Proposed Technologies<\/div>\n<p>           <\/lavel><\/p>\n<div class=\"techonology-details toggle-content\">\n<ul>\n<li><a href=\"\/en\/technology\/construction\/facility5\/\">Proposed Technologies for Offices and Government Buildings<\/a><\/li>\n<\/ul>\n<section>\n<header>\n<h5>Planning and Proposals<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/plan1\/\">BIM<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan2\/\">CG<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan3\/\">CFD\/simulation<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan4\/\">VR<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan5\/\">LC Support System<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan6\/\">Architectural Acoustics Design<\/a><\/li>\n<\/ul>\n<\/section>\n<section>\n<header>\n<h5>Structural Technologies<\/h5>\n<\/header>\n<ul>\n<!--\n \t\n\n<li><a href=\"\/en\/technology\/construction\/struct3\/\">ATOMiK\u5408\u6210\u5730\u4e0b\u5916\u58c1\u69cb\u6cd5<\/a><\/li>\n\n\n--><\/p>\n<li><a href=\"\/en\/technology\/construction\/struct4\/\">RDS Cast-in-Situ Diaphragm Wall Method <\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/struct5\/\">SHS Permanent Ground Anchor Construction Method <\/a><\/li>\n<p><!--\n \t\n\n<li><a href=\"\/en\/technology\/construction\/struct6\/\">SRC-LAPhoop\u5de5\u6cd5<\/a><\/li>\n\n\n--><\/p>\n<li><a href=\"\/en\/technology\/construction\/struct7\/\">Base Isolation Construction Method<\/a><\/li>\n<\/ul>\n<\/section>\n<section>\n<header>\n<h5>Construction Technologies<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/build1\/\">Concrete Fill Compaction Detection System<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/build2\/\">Broad-range Monitoring System of Construction Noise<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan1\/\">BIM<\/a><\/li>\n<\/ul>\n<\/section>\n<\/div>\n<\/section>\n<\/li>\n<li>\n<section class=\"toggle-box\">\n<header>\n            <label class=\"technology-box toggle-button-label\"><\/p>\n<header>\n<div class=\"technology-name-box\">\n<div class=\"technology-name\">\n<div class=\"category-item-name\">Architectural Technologies<\/div>\n<h2>Educational and Cultural Facilities<\/h2>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"technology-image\"><img decoding=\"async\" src=\"\/wp\/wp-content\/uploads\/2018\/03\/kyouiku.jpg\" \/><\/div>\n<\/header>\n<p>            <input class=\"toggle-button\" type=\"checkbox\" \/><\/p>\n<div class=\"toggle-icon\">Proposed Technologies<\/div>\n<p>           <\/lavel><\/p>\n<div class=\"techonology-details toggle-content\">\n<ul>\n<li><a href=\"\/en\/technology\/construction\/facility7\/\">Proposed Technologies for Educational and Cultural Facilities<\/a><\/li>\n<\/ul>\n<section>\n<header>\n<h5>Planning and Proposals<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/plan1\/\">BIM<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan2\/\">CG<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan3\/\">CFD\/simulation<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan4\/\">VR<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan6\/\">Architectural Acoustics Design<\/a><\/li>\n<\/ul>\n<\/section>\n<section>\n<header>\n<h5>Structural Technologies<\/h5>\n<\/header>\n<ul>\n<!--\n \t\n\n<li><a href=\"\/en\/technology\/construction\/struct3\/\">ATOMiK\u5408\u6210\u5730\u4e0b\u5916\u58c1\u69cb\u6cd5<\/a><\/li>\n\n\n--><\/p>\n<li><a href=\"\/en\/technology\/construction\/struct4\/\">RDS Cast-in-Situ Diaphragm Wall Method <\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/struct5\/\">SHS Permanent Ground Anchor Construction Method <\/a><\/li>\n<p><!--\n \t\n\n<li><a href=\"\/en\/technology\/construction\/struct6\/\">SRC-LAPhoop\u5de5\u6cd5<\/a><\/li>\n\n\n--><\/p>\n<li><a href=\"\/en\/technology\/construction\/struct7\/\">Base Isolation Construction Method<\/a><\/li>\n<\/ul>\n<\/section>\n<section>\n<header>\n<h5>Construction Technologies<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/build1\/\">Concrete Fill Compaction Detection System<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/build2\/\">Broad-range Monitoring System of Construction Noise<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan1\/\">BIM<\/a><\/li>\n<\/ul>\n<\/section>\n<\/div>\n<\/section>\n<\/li>\n<li>\n<section class=\"toggle-box\">\n<header>\n            <label class=\"technology-box toggle-button-label\"><\/p>\n<header>\n<div class=\"technology-name-box\">\n<div class=\"technology-name\">\n<div class=\"category-item-name\">Architectural Technologies<\/div>\n<h2>ReReC<\/h2>\n<p><small>Renewal<br \/>\nRenovation<br \/>\nConversion<\/small>\n                  <\/div>\n<\/p><\/div>\n<div class=\"technology-image\"><img decoding=\"async\" src=\"\/wp\/wp-content\/uploads\/2018\/03\/ReReCo.jpg\" \/><\/div>\n<\/header>\n<p>            <input class=\"toggle-button\" type=\"checkbox\" \/><\/p>\n<div class=\"toggle-icon\">Proposed Technologies<\/div>\n<p>           <\/lavel><\/p>\n<div class=\"techonology-details toggle-content\">\n<ul>\n<li><a href=\"\/en\/technology\/construction\/facility9\/\">Proposed Technologies for ReReC<\/a><\/li>\n<\/ul>\n<section>\n<header>\n<h5>Planning and Proposals<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/plan7\/\">Total Support 8<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan5\/\">LC Support System<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan8\/\">Building Diagnosis\uff08BCP\/Business Continuity Plan\uff09<\/a><\/li>\n<\/ul>\n<\/section>\n<section>\n<header>\n<h5>Structural Technologies<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/struct8\/\">Base Isolation Installation Without Leaving: \u201cRetrofit\u201d<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/struct9\/\">Seismic Reinforcement Without Leaving: \u201cMaSTER FRAME\u201d<\/a><\/li>\n<\/ul>\n<\/section>\n<section>\n<header>\n<h5>Construction Technologies<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/build1\/\">Concrete Fill Compaction Detection System<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/build2\/\">Broad-range Monitoring System of Construction Noise<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan1\/\">BIM<\/a><\/li>\n<\/ul>\n<\/section>\n<\/div>\n<\/section>\n<\/li>\n<\/ul>\n<\/div>\n<div class=\"content-column-r\">\n<ul class=\"technologies\">\n<li>\n<section class=\"toggle-box\">\n<header>\n            <label class=\"technology-box toggle-button-label\"><\/p>\n<header>\n<div class=\"technology-name-box\">\n<div class=\"technology-name\">\n<div class=\"category-item-name\">Architectural Technologies<\/div>\n<h2>Production Facilities<\/h2>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"technology-image\"><img decoding=\"async\" src=\"\/wp\/wp-content\/uploads\/2018\/03\/seisanshisetsu01.jpg\" \/><\/div>\n<\/header>\n<p>            <input class=\"toggle-button\" type=\"checkbox\" \/><\/p>\n<div class=\"toggle-icon\">Proposed Technologies<\/div>\n<p>           <\/lavel><\/p>\n<div class=\"techonology-details toggle-content\">\n<ul>\n<li><a href=\"\/en\/technology\/construction\/facility2\/\">Proposed Technologies for Production Facilities<\/a><\/li>\n<\/ul>\n<section>\n<header>\n<h5>Planning and Proposals<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/plan1\/\">BIM<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan2\/\">CG<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan3\/\">CFD\/simulation<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan4\/\">VR<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan6\/\">Architectural Acoustics Design<\/a><\/li>\n<\/ul>\n<\/section>\n<section>\n<header>\n<h5>Structural Technologies<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/struct1\/\">RCS Joint Construction Method<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/struct2\">ZTM Steel Column and Pile Head Joint Method<\/a><\/li>\n<\/ul>\n<\/section>\n<section>\n<header>\n<h5>Construction Technologies<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/build1\/\">Concrete Fill Compaction Detection System<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/build2\/\">Broad-range Monitoring System of Construction Noise<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/build3\/\">Cast-in-place Stainless Steel Floor Construction Method<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan1\/\">BIM<\/a><\/li>\n<\/ul>\n<\/section>\n<\/div>\n<\/section>\n<\/li>\n<li>\n<section class=\"toggle-box\">\n<header>\n            <label class=\"technology-box toggle-button-label\"><\/p>\n<header>\n<div class=\"technology-name-box\">\n<div class=\"technology-name\">\n<div class=\"category-item-name\">Architectural Technologies<\/div>\n<h2>Medical and Welfare Facilities<\/h2>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"technology-image\"><img decoding=\"async\" src=\"\/wp\/wp-content\/uploads\/2018\/03\/fukushishisetsu.jpg\" \/><\/div>\n<\/header>\n<p>            <input class=\"toggle-button\" type=\"checkbox\" \/><\/p>\n<div class=\"toggle-icon\">Proposed Technologies<\/div>\n<p>           <\/lavel><\/p>\n<div class=\"techonology-details toggle-content\">\n<ul>\n<li><a href=\"\/en\/technology\/construction\/facility4\/\">Proposed Technologies for Medical and Welfare Facilities<\/a><\/li>\n<\/ul>\n<section>\n<header>\n<h5>Planning and Proposals<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/plan1\/\">BIM<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan2\/\">CG<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan3\/\">CFD\/simulation<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan4\/\">VR<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan5\/\">LC Support System<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan6\/\">Architectural Acoustics Design<\/a><\/li>\n<\/ul>\n<\/section>\n<section>\n<header>\n<h5>Structural Technologies<\/h5>\n<\/header>\n<ul>\n<!--\n \t\n\n<li><a href=\"\/en\/technology\/construction\/struct3\/\">ATOMiK\u5408\u6210\u5730\u4e0b\u5916\u58c1\u69cb\u6cd5<\/a><\/li>\n\n\n--><\/p>\n<li><a href=\"\/en\/technology\/construction\/struct5\/\">SHS Permanent Ground Anchor Construction Method <\/a><\/li>\n<p><!--\n \t\n\n<li><a href=\"\/en\/technology\/construction\/struct6\/\">SRC-LAPhoop\u5de5\u6cd5<\/a><\/li>\n\n\n--><\/p>\n<li><a href=\"\/en\/technology\/construction\/struct7\/\">Base Isolation Construction Method<\/a><\/li>\n<\/ul>\n<\/section>\n<section>\n<header>\n<h5>Construction Technologies<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/build1\/\">Concrete Fill Compaction Detection System<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/build2\/\">Broad-range Monitoring System of Construction Noise<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan1\/\">BIM<\/a><\/li>\n<\/ul>\n<\/section>\n<\/div>\n<\/section>\n<\/li>\n<li>\n<section class=\"toggle-box\">\n<header>\n            <label class=\"technology-box toggle-button-label\"><\/p>\n<header>\n<div class=\"technology-name-box\">\n<div class=\"technology-name\">\n<div class=\"category-item-name\">Architectural Technologies<\/div>\n<h2>Commercial Facilities<\/h2>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"technology-image\"><img decoding=\"async\" src=\"\/wp\/wp-content\/uploads\/2018\/03\/shougyoushisetsu.jpg\" \/><\/div>\n<\/header>\n<p>            <input class=\"toggle-button\" type=\"checkbox\" \/><\/p>\n<div class=\"toggle-icon\">Proposed Technologies<\/div>\n<p>           <\/lavel><\/p>\n<div class=\"techonology-details toggle-content\">\n<ul>\n<li><a href=\"\/en\/technology\/construction\/facility6\/\">Proposed Technologies for Commercial Facilities<\/a><\/li>\n<\/ul>\n<section>\n<header>\n<h5>Planning and Proposals<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/plan1\/\">BIM<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan2\/\">CG<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan3\/\">CFD\/simulation<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan4\/\">VR<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan5\/\">LC Support System<\/a><\/li>\n<\/ul>\n<\/section>\n<section>\n<header>\n<h5>Structural Technologies<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/struct1\/\">RCS Joint Construction Method<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/struct2\/\">ZTM Steel Column and Pile Head Joint Method<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/struct5\/\">SHS Permanent Ground Anchor Construction Method <\/a><\/li>\n<\/ul>\n<\/section>\n<section>\n<header>\n<h5>Construction Technologies<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/build1\/\">Concrete Fill Compaction Detection System<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/build2\/\">Broad-range Monitoring System of Construction Noise<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan1\/\">BIM<\/a><\/li>\n<\/ul>\n<\/section>\n<\/div>\n<\/section>\n<\/li>\n<li>\n<section class=\"toggle-box\">\n<header>\n            <label class=\"technology-box toggle-button-label\"><\/p>\n<header>\n<div class=\"technology-name-box\">\n<div class=\"technology-name\">\n<div class=\"category-item-name\">Architectural Technologies<\/div>\n<h2>Accommodation Facilities<\/h2>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"technology-image\"><img decoding=\"async\" src=\"\/wp\/wp-content\/uploads\/2018\/03\/shukuhakushisetsu.jpg\" \/><\/div>\n<\/header>\n<p>            <input class=\"toggle-button\" type=\"checkbox\" \/><\/p>\n<div class=\"toggle-icon\">Proposed Technologies<\/div>\n<p>           <\/lavel><\/p>\n<div class=\"techonology-details toggle-content\">\n<ul>\n<li><a href=\"\/en\/technology\/construction\/facility8\/\">Proposed Technologies for Accommodation Facilities<\/a><\/li>\n<\/ul>\n<section>\n<header>\n<h5>Planning and Proposals<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/plan1\/\">BIM<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan2\/\">CG<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan3\/\">CFD\/simulation<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan4\/\">VR<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan5\/\">LC Support System<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan6\/\">Architectural Acoustics Design<\/a><\/li>\n<\/ul>\n<\/section>\n<section>\n<header>\n<h5>Structural Technologies<\/h5>\n<\/header>\n<ul>\n<li style=\"list-style-type: none;\">\n<!--\n \t\n\n<li><a href=\"\/en\/technology\/construction\/struct3\/\">ATOMiK\u5408\u6210\u5730\u4e0b\u5916\u58c1\u69cb\u6cd5<\/a><\/li>\n\n\n--><\/p>\n<li><a href=\"\/en\/technology\/construction\/struct4\/\">RDS Cast-in-Situ Diaphragm Wall Method<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/struct5\/\">SHS Permanent Ground Anchor Construction Method <\/a><\/li>\n<p><!--\n \t\n\n<li><a href=\"\/en\/technology\/construction\/struct6\/\">SRC-LAPhoop\u5de5\u6cd5<\/a><\/li>\n\n\n--><\/p>\n<li><a href=\"\/en\/technology\/construction\/struct7\/\">Base Isolation Construction Method<\/a><\/li>\n<\/ul>\n<\/section>\n<section>\n<header>\n<h5>Construction Technologies<\/h5>\n<\/header>\n<ul>\n<li><a href=\"\/en\/technology\/construction\/build1\/\">Concrete Fill Compaction Detection System<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/build2\/\">Broad-range Monitoring System of Construction Noise<\/a><\/li>\n<li><a href=\"\/en\/technology\/construction\/plan1\/\">BIM<\/a><\/li>\n<\/ul>\n<\/section>\n<\/div>\n<\/section>\n<\/li>\n<\/ul>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Architectural Technologies Logistics Facilities Proposed Technologies Proposed Technologies for Logistics Facilities Planning and Proposals BIM CG CFD\/simulation VR LC Support System Structural Technologies RCS Joint Construction Method Construction Technologies Concrete Fill Compaction Detection System Broad-range Monitoring System of Construction Noise Cast-in-place Stainless Steel Floor Construction Method BIM Architectural Technologies Houses Proposed Technologies Proposed Technologies for Houses Planning and Proposals BIM CG CFD\/simulation VR LC Support System Architectural Acoustics Design Structural Technologies SHS Permanent Ground Anchor Construction Method Base Isolation Construction Method Construction Technologies Concrete Fill Compaction Detection System Broad-range Monitoring System of Construction Noise BIM Architectural Technologies Offices and Government Buildings Proposed Technologies Proposed Technologies for Offices and Government Buildings [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":5551,"menu_order":29,"comment_status":"closed","ping_status":"closed","template":"page-construction.php","meta":{"footnotes":""},"class_list":["post-5704","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/5704","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/comments?post=5704"}],"version-history":[{"count":1,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/5704\/revisions"}],"predecessor-version":[{"id":5705,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/5704\/revisions\/5705"}],"up":[{"embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/5551"}],"wp:attachment":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/media?parent=5704"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}