{"id":5730,"date":"2018-05-16T16:05:07","date_gmt":"2018-05-16T07:05:07","guid":{"rendered":"https:\/\/www.toyo-const.co.jp\/en\/?page_id=5730"},"modified":"2018-05-16T17:52:46","modified_gmt":"2018-05-16T08:52:46","slug":"struct4","status":"publish","type":"page","link":"https:\/\/www.toyo-const.co.jp\/en\/technology\/construction\/struct4","title":{"rendered":"RDS Cast-in-Situ Diaphragm Wall Method"},"content":{"rendered":"<style>\nul.tokucho li:before {\ndisplay: inline-block;\n    content: '';\n    width: 14px;\n    height: 11px;\n    margin-right: 5px;\n    margin-left: -19px;\n    background: url(http:\/\/www.toyo-const.co.jp\/wp\/wp-content\/themes\/toyo2\/images\/common\/icon_check.png) left center no-repeat;\n    background-size: 14px 11px;\n}\n<\/style>\n<div class=\"widebox clearfix\">\n<p>Adopting the high quality and accurate underground continuous wall of the RDS \uff08Underground <span style=\"color: #007ac0;\">R<\/span>igid <span style=\"color: #007ac0;\">D<\/span>iaphragm Wall Construction <span style=\"color: #007ac0;\">S<\/span>ystem\uff09, in addition to the conventional temporary role as a retaining wall and a waterproof wall, it can be used as a structure of reinforced concrete with high rigidity.<\/p>\n<div class=\"mainimg\" style=\"text-align: center;\">\n        <img decoding=\"async\" src=\"https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2018\/05\/tec09.png\" alt=\"\">\n      <\/div>\n<\/div>\n<div id=\"typeC\">\n<div class=\"tecFeatureBox\">\n<div class=\"tecFeatureMiddle\">\n<h3 style=\"margin-bottom: 21px;\">Features<\/h3>\n<ul class=\"tokucho\" style=\"border: solid 3px #0068b6; padding: 30px 20px; color: #0068b6;\">\n<li style=\"margin-left: 19px;\">By managing with the construction with the excavator construction control system, drilling precision management system, concrete placing system, stable liquid management system that are developed for this method, high quality and accurate underground continuous wall can be constructed.<\/li>\n<li style=\"margin-left: 19px;\">Because underground continuous ground walls are used for the main structure, the underground space can be used more widely.<\/li>\n<li style=\"margin-left: 19px;\">The simple joint construction method brings excellent water proofing.<\/li>\n<\/ul><\/div>\n<\/p><\/div>\n<\/div>\n<div class=\"widebox clearfix\">\n<div class=\"mainimg\" style=\"text-align: center;\">\n        <img decoding=\"async\" src=\"https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2018\/05\/tec10_1.png\" alt=\"\"><br \/>\n        <img decoding=\"async\" src=\"https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2018\/05\/tec10_2.png\" alt=\"\">\n      <\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Adopting the high quality and accurate underground continuous wall of the RDS \uff08Underground Rigid Diaphragm Wall Construction System\uff09, in addition to the conventional temporary role as a retaining wall and a waterproof wall, it can be used as a structure of reinforced concrete with high rigidity. Features By managing with the construction with the excavator construction control system, drilling precision management system, concrete placing system, stable liquid management system that are developed for this method, high quality and accurate underground continuous wall can be constructed. Because underground continuous ground walls are used for the main structure, the underground space can be used more widely. The simple joint construction method brings [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":5704,"menu_order":44,"comment_status":"closed","ping_status":"closed","template":"page-construction.php","meta":{"footnotes":""},"class_list":["post-5730","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/5730","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/comments?post=5730"}],"version-history":[{"count":1,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/5730\/revisions"}],"predecessor-version":[{"id":5731,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/5730\/revisions\/5731"}],"up":[{"embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/5704"}],"wp:attachment":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/media?parent=5730"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}