{"id":5759,"date":"2018-05-16T16:30:57","date_gmt":"2018-05-16T07:30:57","guid":{"rendered":"https:\/\/www.toyo-const.co.jp\/en\/?page_id=5759"},"modified":"2018-05-16T17:57:50","modified_gmt":"2018-05-16T08:57:50","slug":"facility6","status":"publish","type":"page","link":"https:\/\/www.toyo-const.co.jp\/en\/technology\/construction\/facility6","title":{"rendered":"Proposed Technologies for Commercial Facilities"},"content":{"rendered":"<h2 class=\"proposals-ttl\">Planning and Proposals<\/h2>\n<div class=\"proposals\">\n<div class=\"proposal\">\n\t\t<a href=\"\/en\/technology\/construction\/plan1\/\"><\/p>\n<div class=\"tags\">\n\t\t\t\t<span class=\"tag tag-blue\">Planning and Proposals<\/span><br \/>\n\t\t\t\t<span class=\"tag tag-pink\">Construction Technologies<\/span>\n\t\t\t<\/div>\n<h3>BIM<\/h3>\n<p>Various preliminary studies and verifications can be easily conducted by using 3D models (BIM) allowing for rotation and enlargement from multiple viewpoints. <\/p>\n<p>\t\t<\/a>\n\t<\/div>\n<div class=\"proposal\">\n\t\t<a href=\"\/en\/technology\/construction\/plan2\/\"><\/p>\n<div class=\"tags\">\n\t\t\t\t<span class=\"tag tag-blue\">Planning and Proposals<\/span>\n\t\t\t<\/div>\n<h3>CG<\/h3>\n<p>By making highly realistic CG renderings incorporating materials to be used, finishes and details can be determined by checking images after completion. <\/p>\n<p>\t\t<\/a>\n\t<\/div>\n<div class=\"proposal\">\n\t\t<a href=\"\/en\/technology\/construction\/plan3\/\"><\/p>\n<div class=\"tags\">\n\t\t\t\t<span class=\"tag tag-blue\">Planning and Proposals<\/span>\n\t\t\t<\/div>\n<h3>CFD,simulation<\/h3>\n<p>By analyzing illuminance and thermal fluid, selecting a model of lighting equipment or air-conditioners, and determining their locations, energy-saving and comfortable room environment can be realized.<\/p>\n<p>\t\t<\/a>\n\t<\/div>\n<div class=\"proposal\">\n\t\t<a href=\"\/en\/technology\/construction\/plan4\/\"><\/p>\n<div class=\"tags\">\n\t\t\t\t<span class=\"tag tag-blue\">Planning and Proposals<\/span>\n\t\t\t<\/div>\n<h3>VR<\/h3>\n<p>By walking through the space of the building in VR during the design process, the scale and usability of the space can be experienced.<\/p>\n<p>\t\t<\/a>\n\t<\/div>\n<div class=\"proposal\">\n\t\t<a href=\"\/en\/technology\/construction\/plan5\/\"><\/p>\n<div class=\"tags\">\n\t\t\t\t<span class=\"tag tag-blue\">Planning and Proposals<\/span>\n\t\t\t<\/div>\n<h3>LC Support System<\/h3>\n<p>It supports decision-making regarding whether the building should be &#8220;renewed and continued to be used&#8221; or&#8221; rebuilt&#8221;.<\/p>\n<p>\t\t<\/a>\n\t<\/div>\n<\/div>\n<h2 class=\"proposals-ttl\">Structural Technologies<\/h2>\n<div class=\"proposals\">\n<div class=\"proposal\">\n\t\t<a href=\"\/en\/technology\/construction\/struct1\/\"><\/p>\n<div class=\"tags\">\n\t\t\t\t<span class=\"tag tag-green\">Structural Technologies (Obtained Performance Evaluation Certificate)<\/span>\n\t\t\t<\/div>\n<h3>RCS Joint Structural System<\/h3>\n<p>It is capable of creating longer-span structures than the reinforced concrete structure, while its column stiffness is higher and thus sways little than steel structure. It is a structural system with advantages of both the reinforced concrete structure and steel structure. <\/p>\n<p>\t\t<\/a>\n\t<\/div>\n<div class=\"proposal\">\n\t\t<a href=\"\/en\/technology\/construction\/struct2\/\"><\/p>\n<div class=\"tags\">\n\t\t\t\t<span class=\"tag tag-green\">Structural Technologies (Obtained Performance Evaluation Certificate)<\/span>\n\t\t\t<\/div>\n<h3>ZTM Steel Column and Pile Head Joint Method <\/h3>\n<p>By partially omitting the footing and the underground beam, the method tries to reduce construction period and cost.<\/p>\n<p>\t\t<\/a>\n\t<\/div>\n<div class=\"proposal\">\n\t\t<a href=\"\/en\/technology\/construction\/struct5\/\"><\/p>\n<div class=\"tags\">\n\t\t\t\t<span class=\"tag tag-green\">Structural Technologies (Obtained Performance Evaluation Certificate)<\/span>\n\t\t\t<\/div>\n<h3>SHS Permanent Ground Anchor Construction Method <\/h3>\n<p>By supporting with anchors, the root depth and foundation volume will be decreased for the reduction of the construction period and costs.<\/p>\n<p>\t\t<\/a>\n\t<\/div>\n<\/div>\n<h2 class=\"proposals-ttl\">Construction Technologies<\/h2>\n<div class=\"proposals\">\n<div class=\"proposal\">\n\t\t<a href=\"\/en\/technology\/construction\/build1\/\"><\/p>\n<div class=\"tags\">\n\t\t\t\t<span class=\"tag tag-pink\">Construction Technologies (Patent and NETIS registered)<\/span>\n\t\t\t<\/div>\n<h3>Concrete Fill Compaction Detection System<\/h3>\n<p>This system determines the state of concrete fill and completion of compaction during concrete casting in real time. <\/p>\n<p>\t\t<\/a>\n\t<\/div>\n<div class=\"proposal\">\n\t\t<a href=\"\/en\/technology\/construction\/build2\/\"><\/p>\n<div class=\"tags\">\n\t\t\t\t<span class=\"tag tag-pink\">Construction Technologies (Patent and NETIS registered)<\/span>\n\t\t\t<\/div>\n<h3>Broad-range Monitoring System of Construction Noise<\/h3>\n<p>It is a monitoring system efficient for construction accompanying noise to be easily spread in a broad range. <\/p>\n<p>\t\t<\/a>\n\t<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Planning and Proposals Planning and Proposals Construction Technologies BIM Various preliminary studies and verifications can be easily conducted by using 3D models (BIM) allowing for rotation and enlargement from multiple viewpoints. Planning and Proposals CG By making highly realistic CG renderings incorporating materials to be used, finishes and details can be determined by checking images after completion. Planning and Proposals CFD,simulation By analyzing illuminance and thermal fluid, selecting a model of lighting equipment or air-conditioners, and determining their locations, energy-saving and comfortable room environment can be realized. Planning and Proposals VR By walking through the space of the building in VR during the design process, the scale and usability of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":5704,"menu_order":32,"comment_status":"closed","ping_status":"closed","template":"page-construction.php","meta":{"footnotes":""},"class_list":["post-5759","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/5759","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/comments?post=5759"}],"version-history":[{"count":1,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/5759\/revisions"}],"predecessor-version":[{"id":5760,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/5759\/revisions\/5760"}],"up":[{"embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/5704"}],"wp:attachment":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/media?parent=5759"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}