{"id":5765,"date":"2018-05-16T16:32:43","date_gmt":"2018-05-16T07:32:43","guid":{"rendered":"https:\/\/www.toyo-const.co.jp\/en\/?page_id=5765"},"modified":"2018-05-16T17:58:55","modified_gmt":"2018-05-16T08:58:55","slug":"facility9","status":"publish","type":"page","link":"https:\/\/www.toyo-const.co.jp\/en\/technology\/construction\/facility9","title":{"rendered":"Proposed Technologies for ReReC\uff08Renewal\u30fbRenovation\u30fbConversion\uff09"},"content":{"rendered":"<h2 class=\"proposals-ttl\">Planning and Proposals<\/h2>\n<div class=\"proposals\">\n<div class=\"proposal\">\n\t\t<a href=\"\/en\/technology\/construction\/plan7\/\"><\/p>\n<div class=\"tags\">\n\t\t\t\t<span class=\"tag tag-blue\">Planning and Proposals<\/span>\n\t\t\t<\/div>\n<h3>Total Support 8<\/h3>\n<p>We support earthquake resistance, risk assessment, rebuilding, building revitalization, subsidization procedure, fund planning, management operation, and fundraising.<\/p>\n<p>\t\t<\/a>\n\t<\/div>\n<div class=\"proposal\">\n\t\t<a href=\"\/en\/technology\/construction\/plan5\/\"><\/p>\n<div class=\"tags\">\n\t\t\t\t<span class=\"tag tag-blue\">Planning and Proposals<\/span>\n\t\t\t<\/div>\n<h3>LC Support System<\/h3>\n<p>It supports decision-making regarding whether the building should be &#8220;renewed and continued to be used&#8221; or&#8221; rebuilt&#8221;.<\/p>\n<p>\t\t<\/a>\n\t<\/div>\n<div class=\"proposal\">\n\t\t<a href=\"\/en\/technology\/construction\/plan8\/\"><\/p>\n<div class=\"tags\">\n\t\t\t\t<span class=\"tag tag-blue\">Planning and Proposals<\/span>\n\t\t\t<\/div>\n<h3>Building Diagnosis\uff08BCP\/Business Continuity Plan\uff09<\/h3>\n<p>We diagnose building safety from the perspective of corporate sustainability (BCP)<\/p>\n<p>\t\t<\/a>\n\t<\/div>\n<\/div>\n<h2 class=\"proposals-ttl\">Structural Technologies<\/h2>\n<div class=\"proposals\">\n<div class=\"proposal\">\n\t\t<a href=\"\/en\/technology\/construction\/struct8\/\"><\/p>\n<div class=\"tags\">\n\t\t\t\t<span class=\"tag tag-green\">Structural Technologies<\/span>\n\t\t\t<\/div>\n<h3>Base Isolation Installation Without Leaving: \u201cRetrofit\u201d<\/h3>\n<p>The earthquake resistance performance of existing buildings can be improved by installing a base isolation device even if occupants stay inside.<\/p>\n<p>\t\t<\/a>\n\t<\/div>\n<div class=\"proposal\">\n\t\t<a href=\"\/en\/technology\/construction\/struct9\/\"><\/p>\n<div class=\"tags\">\n\t\t\t\t<span class=\"tag tag-green\">Structural Technologies (Obtained Performance Evaluation Certificate)<\/span>\n\t\t\t<\/div>\n<h3>Seismic Reinforcement Without Leaving: \u201cMaSTER FRAME\u201d<\/h3>\n<p>It is a non-brace construction method that can make earthquake resistant reinforcement of RC structure while occupants stay inside.<\/p>\n<p>\t\t<\/a>\n\t<\/div>\n<\/div>\n<h2 class=\"proposals-ttl\">Construction Technologies<\/h2>\n<div class=\"proposals\">\n<div class=\"proposal\">\n\t\t<a href=\"\/en\/technology\/construction\/build1\/\"><\/p>\n<div class=\"tags\">\n\t\t\t\t<span class=\"tag tag-pink\">Construction Technologies (Patent and NETIS registered)<\/span>\n\t\t\t<\/div>\n<h3>Concrete Fill Compaction Detection System<\/h3>\n<p>This system determines the state of concrete fill and completion of compaction during concrete casting in real time. <\/p>\n<p>\t\t<\/a>\n\t<\/div>\n<div class=\"proposal\">\n\t\t<a href=\"\/en\/technology\/construction\/build2\/\"><\/p>\n<div class=\"tags\">\n\t\t\t\t<span class=\"tag tag-pink\">Construction Technologies (Patent and NETIS registered)<\/span>\n\t\t\t<\/div>\n<h3>Broad-range Monitoring System of Construction Noise<\/h3>\n<p>It is a monitoring system efficient for construction accompanying noise to be easily spread in a broad range. <\/p>\n<p>\t\t<\/a>\n\t<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Planning and Proposals Planning and Proposals Total Support 8 We support earthquake resistance, risk assessment, rebuilding, building revitalization, subsidization procedure, fund planning, management operation, and fundraising. Planning and Proposals LC Support System It supports decision-making regarding whether the building should be &#8220;renewed and continued to be used&#8221; or&#8221; rebuilt&#8221;. Planning and Proposals Building Diagnosis\uff08BCP\/Business Continuity Plan\uff09 We diagnose building safety from the perspective of corporate sustainability (BCP) Structural Technologies Structural Technologies Base Isolation Installation Without Leaving: \u201cRetrofit\u201d The earthquake resistance performance of existing buildings can be improved by installing a base isolation device even if occupants stay inside. Structural Technologies (Obtained Performance Evaluation Certificate) Seismic Reinforcement Without Leaving: \u201cMaSTER FRAME\u201d [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":5704,"menu_order":30,"comment_status":"closed","ping_status":"closed","template":"page-construction.php","meta":{"footnotes":""},"class_list":["post-5765","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/5765","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/comments?post=5765"}],"version-history":[{"count":1,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/5765\/revisions"}],"predecessor-version":[{"id":5766,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/5765\/revisions\/5766"}],"up":[{"embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/5704"}],"wp:attachment":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/media?parent=5765"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}