{"id":6668,"date":"2022-03-03T16:18:37","date_gmt":"2022-03-03T07:18:37","guid":{"rendered":"http:\/\/www.toyo-const.co.jp\/en\/?p=6668"},"modified":"2022-08-30T16:19:55","modified_gmt":"2022-08-30T07:19:55","slug":"announcement-of-construction-of-cable-laying-vessel","status":"publish","type":"post","link":"https:\/\/www.toyo-const.co.jp\/en\/topics-6668","title":{"rendered":"Announcement of Construction of Cable-laying Vessel"},"content":{"rendered":"<p>Toyo Construction Co., Ltd. (President and Representative Director: Kyoji Takezawa) are pleased to<br \/>\nannounce the decision to construct a new vessel for cable laying.<\/p>\n<p>Offshore wind power generation, which is considered an effective means of Japan\u2019s renewable energy<br \/>\nbusiness, is expected to begin full-scale implementation in the oceanic region. Various work vessels<br \/>\nwill be required for construction of offshore wind power generation facilities, and particularly, there<br \/>\nwill be a very strong demand for self-propelled work vessels that handle the cable laying work,<br \/>\npartly because, in addition to the fixed-bottom and floating type, the submarine DC power transmission<br \/>\nconnecting Honshu and Hokkaido promoted by the government is scheduled. Also, since the introduction of<br \/>\nfloating offshore wind power generation is expected to progress, it is expected that there will be increasing<br \/>\ndemand for suitable offshore work vessels.<\/p>\n<p>For these reasons, we have decided to construct the nation\u2019s largest self-propelled cable-laying vessel<br \/>\nto meet these demands.<\/p>\n<p>We will construct the vessel taking into account the construction of floating offshore wind power<br \/>\ngeneration facilities, and by utilizing the cable-laying vessel in various fields, we will contribute to<br \/>\nthe spread of offshore wind power generation.<\/p>\n<p>&nbsp;<\/p>\n<div id=\"attachment_6669\" style=\"max-width: 810px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-6669\" class=\"wp-image-6669\" src=\"https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2022\/03\/20220228-1024x576.jpg\" alt=\"\" width=\"800\" height=\"450\" srcset=\"https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2022\/03\/20220228-1024x576.jpg 1024w, https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2022\/03\/20220228-300x169.jpg 300w, https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2022\/03\/20220228-768x432.jpg 768w, https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2022\/03\/20220228.jpg 1280w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-6669\" class=\"wp-caption-text\">Image of the cable-laying vessel<\/p><\/div>\n<p>&nbsp;<\/p>\n<p>\u3010Intended use\u3011<\/p>\n<p>\u25cf Laying a submarine cable between an offshore wind power generation facility and an onshore substation<\/p>\n<p>\u203b Overview of the submarine cable laying work<\/p>\n<p>Laying a power cable loaded on the cable laying vessel along a planned route; connecting turbines to<br \/>\neach other and to the onshore terminus.<\/p>\n<p>\u25cf Various offshore works such as foundation pile works for fixed-bottom and floating type<\/p>\n<p>&nbsp;<\/p>\n<p>\u3010Features\u3011<\/p>\n<p>\u25cf 120m long and 27m wide; large deck area of approx. 2,500m2 which enables the arrangement of equipment<br \/>\nnecessary for cable-laying and offshore construction.<\/p>\n<p>\u25cf Self-propelled vessel equipped with a propulsion device enabling self-navigation in the oceanic region.<\/p>\n<p>\u25cf Equipped with a dynamic positioning system equivalent to the DPS Class-2* required for offshore wind<br \/>\npower in Europe.<\/p>\n<p>\u25cf Equipped with accommodation facilities for a large number of crew members and passengers, enabling<br \/>\nlong-term offshore work.<\/p>\n<p>\u25cf Mounted with a 250t crane with active heave compensation that can handle large water depths.<\/p>\n<p>DPS Class-2*: A redundant system that does not lose positioning capabilities even if the main<br \/>\nequipment fails.<\/p>\n<p>&nbsp;<\/p>\n<p>\u3010Schedule\u3011FY 2022: Design, FY 2023: Commencement of construction, FY 2025: Completion &amp; Delivery<\/p>\n<p>&nbsp;<\/p>\n<div style=\"text-align: right;\" align=\"left\">For inquiries, please contact:<\/div>\n<div style=\"text-align: right;\" align=\"left\">Toyo Construction Co., Ltd.<\/div>\n<div style=\"text-align: right;\" align=\"left\">Offshore Wind Dept.<\/div>\n<div style=\"text-align: right;\" align=\"left\">Civil Construction Div.<\/div>\n<div style=\"text-align: right;\" align=\"left\">Tel: +81-(0)3-6361-5462<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Toyo Construction Co., Ltd. (President and Representative Director: Kyoji Takezawa) are pleased to announce the decision to construct a new vessel for cable laying. Offshore wind power generation, which is considered an effective means of Japan\u2019s renewable energy business, is expected to begin full-scale implementation in the oceanic region. Various work vessels will be required for construction of offshore wind power generation facilities, and particularly, there will be a very strong demand for self-propelled work vessels that handle the cable laying work, partly because, in addition to the fixed-bottom and floating type, the submarine DC power transmission connecting Honshu and Hokkaido promoted by the government is scheduled. Also, since the [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[359,354,104],"tags":[],"class_list":["post-6668","post","type-post","status-publish","format-standard","hentry","category-2021-t","category-technicalnews","category-topics","posttemplate-topics-typed"],"_links":{"self":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/posts\/6668","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/comments?post=6668"}],"version-history":[{"count":7,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/posts\/6668\/revisions"}],"predecessor-version":[{"id":6861,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/posts\/6668\/revisions\/6861"}],"wp:attachment":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/media?parent=6668"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/categories?post=6668"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/tags?post=6668"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}