{"id":7257,"date":"2023-04-12T11:32:21","date_gmt":"2023-04-12T02:32:21","guid":{"rendered":"http:\/\/www.toyo-const.co.jp\/en\/?p=7257"},"modified":"2023-04-12T11:32:21","modified_gmt":"2023-04-12T02:32:21","slug":"toyo%e3%80%80bim%e3%80%80forum%e3%80%80%ef%bc%92%ef%bc%90%ef%bc%92%ef%bc%93architecture-dx-development-from-bim-process-to-data-science%ef%bd%a5generative-ai%ef%bd%a5metaverse-was-held","status":"publish","type":"post","link":"https:\/\/www.toyo-const.co.jp\/en\/topics-7257","title":{"rendered":"TOYO\u3000BIM\u3000Forum\u3000\uff12\uff10\uff12\uff13~Architecture DX: Development from BIM Process to Data Science\uff65Generative AI\uff65Metaverse~ was held."},"content":{"rendered":"<p>Toyo Construction Co., Ltd. (President and Representative Director: Kyoji Takezawa) held the<br \/>\n\u201cTOYO BIM Forum 2023\u201d in the meeting room of Head Office on March 17. This forum, which<br \/>\nhas been held eight times now, was held allowing online participation by hybrid method, in<br \/>\naddition toparticipation in the meeting room, with participation of over 80 officers and staff.<\/p>\n<p>At the opening, Mr. Hiromi Hirata, Director and Vice President Executive Officer &amp; General<br \/>\nManager ofArchitectural Construction Div., told that construction industry is rapidly changing<br \/>\nby the automation of construction process and the introduction of technologies to realize<br \/>\noptimization, and that the construction DX, BIM and AI are the core of this innovation as well<br \/>\nas the critical element to form the future of construction industry, and that it is expected that<br \/>\nmany people will notice various issues of construction industry through the utilization of these<br \/>\ntechnologies for the issues such as reduction of CO<sub>2<\/sub> emission amount or labor shortage and<br \/>\naging of workers.<\/p>\n<p>&nbsp;<\/p>\n<div id=\"attachment_7258\" style=\"max-width: 264px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-7258\" class=\"wp-image-7258 size-medium\" src=\"https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-1-254x300.png\" alt=\"\" width=\"254\" height=\"300\" srcset=\"https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-1-254x300.png 254w, https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-1.png 368w\" sizes=\"auto, (max-width: 254px) 100vw, 254px\" \/><p id=\"caption-attachment-7258\" class=\"wp-caption-text\">Mr. Hirata, General Manager of Architectural<br \/>Construction Div.<\/p><\/div>\n<p>&nbsp;<\/p>\n<p>For this forum, we invited industry leaders, professionals and engineers, as external partners.<br \/>\nIn the morning session, following the reports of the design review conducted this fiscal year,<br \/>\nthe visualization of findings that arose during the process of design verification, and the<br \/>\nmetaverse, we exchanged views on the possibility that the image generation by AI may have<br \/>\nan influence on the implication of design, etc. In the afternoon session, the achievement was<br \/>\nreported, with partner companies that jointly addressed the challenges in the BIM model<br \/>\nproject, and in a related move, a panel discussion was presented. Each of the verified<br \/>\nchallenges is the critical technology for the future construction DX, and we had a lively<br \/>\nexchange of views about the necessity of continuous technology development, etc.<\/p>\n<p>&nbsp;<\/p>\n<div id=\"attachment_7260\" style=\"max-width: 1034px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-7260\" class=\"wp-image-7260 size-large\" src=\"https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-2-1024x327.png\" alt=\"\" width=\"1024\" height=\"327\" srcset=\"https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-2-1024x327.png 1024w, https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-2-300x96.png 300w, https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-2-768x246.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><p id=\"caption-attachment-7260\" class=\"wp-caption-text\">Digital dashboard of BIM process for design &amp; construction<br \/> R4 MLIT BIM model project (Leading Entrepreneur Type) Result of valuation and verification of design estimation\uff65AI cost forecasting model), etc,<\/p><\/div>\n<p>&nbsp;<\/p>\n<div id=\"attachment_7261\" style=\"max-width: 1034px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-7261\" class=\"wp-image-7261 size-large\" src=\"https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-3-1024x260.png\" alt=\"\" width=\"1024\" height=\"260\" srcset=\"https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-3-1024x260.png 1024w, https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-3-300x76.png 300w, https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-3-768x195.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><p id=\"caption-attachment-7261\" class=\"wp-caption-text\">R4 MLIT BIM model project (Leading Entrepreneur Type) \/ Verification of construction supervision task by an autonomous drone<br \/> \u3000(from the left; during construction, at completion, scene of remote control from Head Office)<\/p><\/div>\n<p>&nbsp;<\/p>\n<div id=\"attachment_7262\" style=\"max-width: 1034px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-7262\" class=\"wp-image-7262 size-large\" src=\"https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-4-1024x327.png\" alt=\"\" width=\"1024\" height=\"327\" srcset=\"https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-4-1024x327.png 1024w, https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-4-300x96.png 300w, https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-4-768x246.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><p id=\"caption-attachment-7262\" class=\"wp-caption-text\">R4 MLIT BIM model project (Leading Entrepreneur Type) \/ Talk session with partner companies\u2019 staff<br \/> Photo on the right: starting from the left; Mr. Maeda, Head of Digital Experience Design Group of Architectural Construction Div., Nisseki Survey Co., Ltd.<br \/>(Mr. Ikushima, Mr. Takahashi), AKARI Inc. (Mr. Mori), SENSYN ROBOTICS, Inc. (Mr. Anezaki, Mr. Saito), Mr. Kita and Ms. Takehana, Senior Staff,<br \/>of DX Group of Architectural Construction Div.<\/p><\/div>\n<p>&nbsp;<\/p>\n<p>This BIM Forum 2023 provided a valuable opportunity to share information and exchange<br \/>\nviews with industry specialists on the latest technological trends and challenges that forge the<br \/>\nfuture of construction industry. Regarding the challenges related to the construction BIM, Mr.<br \/>\nSasaki, Project Manager who is working on the utilization of overseas human resources as an<br \/>\nexample of the challenge on the front line, made a case report, and it was confirmed that the<br \/>\nsignificant reduction in working hours and improvement of work efficiency, which is necessary<br \/>\nfor the BIM modelization, have been realized and that we will aim to utilize it proactively.<\/p>\n<p>Also, regarding the construction BIM training for staff at sites, the achievement of<br \/>\nexperience-based training that was introduced in FY 2022 was reported. Experience-based<br \/>\ntraining, aiming to hold a construction BIM coordination meeting led by the site (a meeting to<br \/>\ndiscuss the interference check and balance utilizing the three-dimensional model), handles the<br \/>\nprocess to exchange findings on the cloud platform (Autodesk BIM360), contents of which are<br \/>\npractical in that the construction staff indicate the interference points and balance as an<br \/>\nindividual specialty contractor and provide answers. In the questionnaire replies after the<br \/>\ntraining, it was reported that 87% of staff wanted continuing training.<\/p>\n<p>&nbsp;<\/p>\n<div id=\"attachment_7259\" style=\"max-width: 1034px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-7259\" class=\"wp-image-7259 size-large\" src=\"https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-5-1024x279.png\" alt=\"\" width=\"1024\" height=\"279\" srcset=\"https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-5-1024x279.png 1024w, https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-5-300x82.png 300w, https:\/\/www.toyo-const.co.jp\/en\/wp\/wp-content\/uploads\/2023\/04\/20230405-5-768x209.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><p id=\"caption-attachment-7259\" class=\"wp-caption-text\">Front line of construction BIM \/ BIM training \/ Utilization status of BIM<br \/> (from the left; Mr. Hatano, Deputy General Manager, Mr .Takano, Mr. Sasaki, Project Manager, Mr. Sakai, General Manager of<br \/>Architectural Construction Dept., Mr. Hara, Assistant Manager)<\/p><\/div>\n<p>&nbsp;<\/p>\n<p>The Company will continue to proactively introduce the advanced technology including the<br \/>\nBIM and contribute to resolving the challenges of construction industry.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Toyo Construction Co., Ltd. (President and Representative Director: Kyoji Takezawa) held the \u201cTOYO BIM Forum 2023\u201d in the meeting room of Head Office on March 17. This forum, which has been held eight times now, was held allowing online participation by hybrid method, in addition toparticipation in the meeting room, with participation of over 80 officers and staff. At the opening, Mr. Hiromi Hirata, Director and Vice President Executive Officer &amp; General Manager ofArchitectural Construction Div., told that construction industry is rapidly changing by the automation of construction process and the introduction of technologies to realize optimization, and that the construction DX, BIM and AI are the core of this [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[372,354,104],"tags":[],"class_list":["post-7257","post","type-post","status-publish","format-standard","hentry","category-2023-t","category-technicalnews","category-topics","posttemplate-topics-typed"],"_links":{"self":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/posts\/7257","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/comments?post=7257"}],"version-history":[{"count":10,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/posts\/7257\/revisions"}],"predecessor-version":[{"id":7272,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/posts\/7257\/revisions\/7272"}],"wp:attachment":[{"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/media?parent=7257"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/categories?post=7257"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.toyo-const.co.jp\/en\/wp-json\/wp\/v2\/tags?post=7257"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}